Phone +86 188 4896 3680
sales@ghcooling.com
DOWNLOAD
FAQ
Home
About
About Us
Tech Center
Products
Projects
News
Company News
Industry News
Contact
Get A Quote
NEWS
Home
NEWS
Luoyang local client order two sets of closed cooling tower
Luoyang Refrigeration Enterprise ordered two sets of closed cooling tower from Gaohua, one is counter flow high temperature closed cooling tower...
29 Aug, 2020
The finned tube produced for the Shijiazhuang customer has successfully arrived at the customer site.
Finned tube is a kind of heat exchange tube to improve the heat exchange efficiency.
13 Aug, 2020
Old customers reorder evaporative condenser coil from us.
Gaohua old customer reorder evaporative condenser coil from us. This is the third time, this client place a order to Gaohua
15 Jul, 2020
The evaporative condenser customized for Hebei customers is stepping up production
Evaporative condenser is one of our main product, which is wildly welcomed by domestic and foreign customers.
15 Jul, 2020
Beijing customer ordered one closed cooling tower from Gaohua
Beijing customer ordered one sets of closed cooling tower from us. At present, the technical agreement has been confirmed and our factory is in the process of production.
15 Jul, 2020
10 sets of evaporative condensers have been completed and are ready for shipment to clients.
10 evaporative condensers ordered by domestic customers from us have been completed, and the workers are busy shipping.
13 Jul, 2020
1
2
...
7
8
9
10
11
12
13
14
15
News Type
company
industry
latest news
Evaporative condenser manufactured by GH Cooling are applied to waste heat power generation project in petrochemical industry
Sep 19, 2022
The closed cooling tower is working well at the air separation customer site
Jun 06, 2022
The first batch air cooled heat exchangers have been shipped to Tinajin Port
May 11, 2022
The inlet air temperature of air cooler has a great influence on its thermal performance. If the air cooler is improperly arranged, its air temperature at the inlet will be higher than the local average temperature.
Mar 29, 2022
Evaporative condenser for synthetic ammonia is shipping
Dec 16, 2021
Tube box type evaporative condensers used in metallurgical industry are in production
Oct 27, 2021
The dry and wet closed cooling towers are being installed at the customer site in Inner Mongolia
Aug 09, 2021
Waste Heat Power Generation Project Steam Turbine Power Station 40MW Unit Power Station Direct Air Cooling System
Jun 22, 2021
What are the common faults of air cooler and how to remove them?
Apr 28, 2021
The air cooled heat exchanger has completed production and ready for shipping
Mar 09, 2021
Feedback from customer on site-Luoyang Gaohua six sets evaporative condensers are installing.
Nov 09, 2020
Two sets compound-type evaporative condensers for coal chemical plant
Oct 19, 2020
The dry combined closed cooling tower with stainless steel customized
Sep 30, 2020
10 sets of evaporative condensers have been completed and are ready for shipment to clients.
Jul 13, 2020